Steady on Point.

Powered land for mission-critical growth.

AI compute has to sit somewhere. Birddog develops the physical layer of AI infrastructure in the urban cores where inference has to live.

For AI, neo cloud, and industrial users, land assembly, power procurement, entitlement, delivery

Texas Triangle · Industrial outdoor storage · Electrified IOS · Powered land Scroll

Every model, agent, and inference request eventually resolves to a physical address. We develop the address.

How the system works

Complexity

Compute is easy to buy. Somewhere to put it isn't.

GPUs ship on a purchase order. The land, power, and permits underneath them take years, and most metro parcels can't carry the load at all.

Constraint

Power sets the ceiling.

Interconnection queues and substation capacity decide what gets built. Until a site has a secured path to power, it is an option and nothing more.

Assembly

We assemble what can't be assembled later.

Infill parcels acquired one at a time and stitched into a contiguous position, with entitlements and a power path secured before capital goes to work.

Architecture

Four layers we deliver. Four you run.

Land, power, entitlement, and delivery are ours. Compute, orchestration, models, and inference are yours.

Birddog delivers the foundation layer

Outcome

Build-ready, inside the metro.

Sites with a secured power path, close enough for inference and entitled enough to start.

Partnership

A development partner, accountable for delivery.

Sourcing, capital, entitlement, and construction under one roof, so the site that gets delivered is the site that was promised.

Principal-led, start to finish
01 The Stack

Where we stop, and you start.

  • handoff
Birddog delivers

Land

Infill parcels inside supply-constrained metros, acquired one at a time and assembled into a contiguous, buildable position.

Parcel aggregationInfill positionsSupply-constrained metros
02 What We Build

Three disciplines. One platform.

01 / IOS

Industrial Outdoor Storage

Cash-flowing infill yards for logistics, fleet, and service tenants. Hard-zoned land that cities rarely approve anymore, aggregated and managed by our own asset management team.

Aerial view of an industrial outdoor storage yard at dusk
02 / eIOS

Electrified IOS

The same yards, energized: fleet charging, autonomous vehicle depots, and the first real rung of power delivery. An IOS site that earns on electrons as well as acreage.

Urban logistics yard with fleet vehicles
03 / PWR

Powered Land

The same dirt at utility scale. Interconnection procured, entitlements cleared, and the site delivered build-ready for edge data centers and mission-critical users.

High-voltage substation at dawn
03 Approach

Mission-critical supply chain.

Behind every model, network, and autonomous system sits a physical chain: land, power, entitlement, logistics. Birddog works at that intersection, assembling inputs that can't be sourced at scale once the market prices them in.

We work with landowners, utilities, and capital partners across Dallas-Fort Worth, Houston, Austin, and San Antonio.

Built With the Off-Takes in Mind

We develop against real demand: AI companies, neo clouds, and industrial users who need powered, entitled sites inside the metro on a timeline the grid alone can't offer.

Power

Procurement, interconnection, deliverability.

Land

Infill positions in supply-constrained metros.

Entitlement

Zoning and consent secured before capital.

Logistics

Freight, fiber, and last-mile relevance.

Execution

Construction and delivery in-house.

Diligence

Under One Roof

Sourcing, capital, entitlement, operations, and construction are handled by the same team that underwrites the deal.

Principal-Led

Every inquiry about a site, partnership, or capital is read by a principal. No brokered handoffs between the people who commit and the people who deliver.

Texas Triangle Focus

One region, worked in depth. Dallas-Fort Worth, Houston, Austin, and San Antonio, where metro demand, industrial land, and utility capacity overlap.

Underwritten to the Off-Take

Sites are developed against identified demand, so the delivery date and the power path are set by a user's requirement.

05 Investor Access

Materials and reporting, behind the portal.

Offering materials, quarterly reporting, and data room access are shared with qualified investors on request.

Access the Investor Portal (opens in a new tab)

Existing investors sign in through the portal · New investors can request access

06 Contact

Start a conversation.

Tell us the site, the power requirement, or the thesis. A principal reads every message and answers directly.

Or email Brandon Schubert, Principal

bs@bdvtx.com

7250 Dallas Parkway, Suite 400 · Plano, TX 75024